Počet záznamov: 1  

zaťaženie zubných implantátov, okamžité

  1. SYSd057893
    LBL
      
    00000cx--j2200000---45--
    005
      
    20240119200635.4
    100
      
    $a 20110101asloy0103----ba0
    152
      
    $b mesh
    250
      
    $a zaťaženie zubných implantátov, okamžité $x AE $x CL $x EC $x ED $x ES $x HI $x IS $x MO $x MT $x NU $x PX $x SN $x ST $x TD $x VE $8 slo
    300
    1-
    $a 2011 $8 eng
    300
    1-
    $a Dental Implantation, Endosseous (2007-2010) $8 eng
    330
    1-
    $a Endosseous dental implantation where implants are fitted with an abutment or where an implant with a transmucosal coronal portion is used immediately (within 1 week) after the initial extraction. Conventionally, the implantation is performed in two stages with more than two months in between the stages. $8 eng
    450
      
    $a Dental Implant Loading, Immediate $5 e $8 eng
    450
      
    $a Socket Shield Technique $5 e $8 eng
    450
      
    $a Socket-Shield Technique $5 e $8 eng
    450
      
    $a zaťaženie dentálnych implantátov, okamžité $5 e $8 slo
    450
      
    $a technika socket shield $5 e $8 slo
    450
      
    $a metóda socket shield $5 e $8 slo
    686
      
    $a E04.545.550.280.280.350
    686
      
    $a E04.650.230.500.350
    686
      
    $a E06.645.550.280.280.450
    686
      
    $a E06.780.314.310.450
    750
      
    $a Immediate Dental Implant Loading $8 eng
    801
    -0
    $a SK $b BA006 $c 20110127
    801
    -0
    $a SK $b BA006 $c 20110706
    801
    -2
    $a SK $b BA006 $c 20220128
    980
      
    $x M
Počet záznamov: 1  

  Tieto stránky využívajú súbory cookies, ktoré uľahčujú ich prezeranie. Ďalšie informácie o tom ako používame cookies.